1-2. Lesson 1 Practice Exercise, Continued
__________________________________________________________________
10.
Which staff section or subordinate unit of the TAMCA organization coordinates and monitors
movement of "out-of-gauge" shipments?
A.
PPD.
B.
FMD.
C.
PMD.
D.
SMD.
11.
Which of the following statements about operational phases of deployment is true?
A.
Theater reception begins with the arrival of forces and sustainment at the POD in the AO
and ends when the forces depart towards their assigned location.
B.
Theater onward movement begins with the arrival of forces and sustainment at the POD
in the AO and ends when the forces depart towards their assigned location.
C.
Theater reception begins with the arrival of forces and sustainment at the POE in the AO
and ends when the forces depart towards their assigned location.
D.
Theater onward movement begins with the linkup of personnel and equipment at the POE
in the AO and ends when the forces depart towards their assigned location.
12.
The theater movement program in assessing the distribution pattern within the AO identifies the
nodes within the transportation system and determines the locations for all of the following
except.
A.
PODs.
B.
Transitions through the staging areas, including supply and maintenance sites.
C.
Terminals within the tactical AO.
D.
The POEs.
13.
Changing transportation operator work load, the commander's priorities, or adding capabilities
are examples of which of the following theater movement program steps?
A.
Balancing the requirements against the capabilities.
B.
Determining critical points.
C.
Programming by schematics.
D.
Determining transportation capabilities.
__________________________________________________________________
Continued on next page
1-55
TR2013