The remedial work described in this report would restore the railroad network to a fully functional level, in
a cost-effective manner. Remedial work has been specified only for those sections of track where the
work is most needed. Tracks with no current use are not included in the plan.
The work plan has been designed so that when completed, the railroad network would require only
normal routine maintenance to keep it fully functional for the foreseeable future.