Army Terminal Operations, Continued
1A-5.
Terminal
throughput
capacity,
continued
All the capacities addressed above are considered in determining the throughput
Throughput
capacity of terminal. Other considerations such as the threat, weather, and the
sample
availability of labor are also taken into account. The table on the next page
checklist
provides a sample checklist for estimating water terminal throughput capacity.
Continued on next page
TR1025
1-18