Weight
C.
Spanish.
D.
Korean.
3
13. Old crossties are removed from the track by using tie:
A.
Jacks.
B.
Gages.
C.
Tongs.
D.
Adzes.
3
14. In carrying out an out-of-face raise, the track foreman's duties include all of the following
except:
A.
Safeguarding the men and trains.
B.
Making the final check of the completed work.
C.
Assigning the men's duties.
D.
Determining what tools are available.
3
15. The lining of high-speed tangent track is best established by:
A.
Spot board.
B.
Sighting block.
C.
Eye.
D.
Transit.
3
16. Gage is checked with a:
A.
Track gage.
B.
Scratch board.
C.
Lifting bar.
D.
Gage rod.
3
17. An inspection of crossties by the track foreman indicates that several need to be replaced. If
you ware the track supervisor, your next move would be to:
A.
Inspect the ties after they have been removed from the roadbed.
B.
Daub red lead paint on the end of each one to be replaced.
C.
Spot check the ties before they are removed from the roadbed.
D.
Give the ties a final inspection before they are removed from the roadbed.
7