603/4
Weight
Exercise
5
11.
D. (par. 5.6)
11 x 2 x 1,000 = 22,000 lb.
5
12.
B. (par. 5.6)
30,000 + 26,000 + 22,000 = 78,000 lb.
5
13.
C. (par. 5.3b)
Fuel required = SE x average no. hrs. each is operated
daily x fuel consumption factor x 30
(no. of days per mo.) + reserve
Switch engines = 5 + 3 + 3 + 5 = 16
16 SE x 20 hrs opn x 8 FCF x 30 days per month = 76,800
76,800 x .05 reserve = 3,840
76,800 + 3,840 = 80,640 gal per mo
5
14.
C. (table VII)
5
15.
B. (pars. 5.4a, 5.5)
Computation
2,740 x .05 reserve = 137
5
16.
D. (par. 5.4a)
5
17.
D. (par. 5.3a)
14