b. General Condition:
1) Alignment: Track alignment is generally fair, with some poor sections.
2) Surface/Crosslevel: Track surface is generally adequate, although poor in places on the east half of the
East Line, west half of the West Line, and spots on the Main Line. Track surface is also poor in some
loading sidings. A few curves have excessive superelevation.
1)
Gage: Track gage is generally good, with the exception of some of the road crossings, where
wide gage is common, and spots where skewed ties have caused tight gage.
Bridges
a. Description: There are three all-timber bridges:
Line
Location
Length
Deck Type
Main
19+13
64 ft
Open
West
9+02
85 ft
West
40+00
122 ft
Open
b. General Condition: These bridges were thoroughly inspected about 2 years previously, and found to be
in good condition. During this visit, the bridges were given a brief inspection, and no obvious defects
were apparent.
C-16